Skip to main content
Loading…
Article III. Private Streets
This article is included in your selections.
This section is included in your selections.

All private streets shall be constructed by the applicant and inspected by the project engineer who shall issue a letter of compliance to the applicant with a copy to the City certifying the following:

A. The private street has been constructed in accordance with the Engineering Standards Manual.

B. The street signs are in place.

C. The storm drainage, if applicable, has been constructed in accordance with the project engineer’s design.

D. The gate (if applicable) has been installed in conformance with all applicable codes.

E. Existing and new bridge structures, if any, comply with all applicable codes.

F. The compliance letter shall be stamped, signed, and dated by the project engineer and shall be worded as follows:

I have inspected the project and find that the private street and storm drainage as constructed for this project conform to the terms and conditions of the submitted design and requirements of the City’s development standards and regulations, and that the appropriate street signs are in place.

A revised set of plans showing alterations to the previous accepted plans shall be submitted with the letter of compliance. [Ord. 501 § 3, 2009.]