Skip to main content
Loading…
This section is included in your selections.

Whenever a binding site plan for a residential condominium development is proposed on a parcel of land for which a building permit has been issued for the entire project, the following must be satisfied prior to recording:

A. A plan shall be prepared in a form prescribed by the Director which is adequate for permanent retention by the Pierce County Auditor’s Office.

B. The plan must be prepared by a registered land surveyor or civil engineer.

C. The plan must substantially reflect the site plan approved for the building permit. Specific details not relevant to the division of land may be omitted.

D. The plan must be verified by the Director for compliance with the approved building permit. The Director may require dedication of additional right-of-way for public streets.

E. The legal description and map must be verified by the City Engineer. [Ord. 591 § 66, 2015; Ord. 60 § 1, 1996.]